This install was to offload and install 60 W J Whites wall boards, this was achieved with 6 men fully trained on Whites products, over a 4 day install period.
This install was to offload and install 60 W J Whites wall boards, this was achieved with 6 men fully trained on Whites products, over a 4 day install period.